Title | CoAuthors | Main Language | Views | Readings |
---|---|---|---|---|
ADDITIONAL COSTS ASSOCIATED WITH THE FAILURE, CANCELLATION, OR POSTPONEMENT OF THE START OF THE SCHEDULED "WINDOW FOR TRACK REPAIRS TYTDMI |
Merganov A.M., Kurenkov P.V., Bondarenko T.A., Lesov K.S. |
Rus | 188 | 188 |
IMPACT OF TRACK REPAIR "WINDOWS" REGIME ON ECONOMIC INDICATORS OF RAILROAD OPERATION TYTDMI |
Kurenkov P.V., Bondarenko T.A., Lesov K.S., Kenjaliyev M.K. |
Rus | 101 | 101 |
CALCULATION OF THE OPTIMAL DURATION OF RAILWAY TRACK CLOSURE FOR THE ENTIRE PERIOD OF REPAIR WORKS TYTDMI |
Bondarenko T.A., Turaev B.K. |
Rus | 44 | 44 |