logo
calendar15 Mart 2024
view27
Main language:Uzbek

DEVELOPMENT OF AN ACCEPTABLE VARIANT OF THE FILL MATERILS BEING USED TO FILL THE GAP MINED AT THE KOVULDI GOLD MINE

Field of Science:
pdf

65f3f43d435ec.pdf

PDF

ARTICLE ANNOTATION

quote
In the article " Almaliq KMK" JSC Thermal Power Center (IEM) using the ash and non-combustible part of the coal used in heating steam boilers, the advantages and possibilities of filling the mined space and its technical implementation are calculated. The calculation and analysis of economic indicators shows the inconsistency of these modifications to the goal Under the conditions of the Kovuldi mine, the cost of the solidifying filler for 1m3 was developed, and based on the developed mining plan, it was required that the share of additional crustaceans in this amount does not exceed 22%. Based on this condition, the economic calculation of the proposed option is determined. Economic indicators satisfy the requirements of their share in the total cost amount. The specifications, on the other hand, do not meet the requirements of the 25,000 m3 fillings envisaged in the mine works plan, which means that it is not possible to provide the amount of additional coagulation enhancers needed to complete the annual plan. The less the share of additional capacity-enhancing agents in the total cost amount, and the less the supply satisfies at least the annual need, this is considered to be of additional economic purpose.

AUTHORS

Tags

# cement# цемент# sement# mining system# hardening filler# coal ash# red sand# fraction sizes# transportability (pre-chamber de# kemera# твердеющий наполнитель# угольная зола# красный песок# размеры фракций# транспортабельность (форкамерная# кемера# система добычи# qotuvchi tо‘lg‘azma# kо‘mir kuli# qizil qum# fraksiya o‘lchamlari# transportabellik (kameragacha ye# qazib olish tizimi

OTHER ARTICLES IN THIS JOURNAL

Rate Article

0
0 ratings
5
4
3
2
1

Article Identifiers

References

Berdieva D.H. "Improvement of laying works in the development system of the Kauldi deposit", Economics and sotsium, articles509-513, 2020

Berdieva Dilrabo Khasanovna, Subanova Zarnigor Abdinabi kizi "On the issue of reducing the cost of laying in the development system of horizontal layers with a bookmark" Oriental Renaissance: Innovative, edusational, natural and social sciences, art. 674-679. 2021/5.

Berdieva D.H. Kosimov M.O. "Vibor of the optimal variant of the development system at the Kauldi mine" Oriental Renaissance: Innovative, edusational, natural and social sciences, st 235-240, 2021/7

Berdieva D.H., Mamazieva G.G. "Converters of the chamber-column processing system on the spot" Economics and society. st 303-307 2021

Бердиева Д Х. Косимов М. О. «Усовершенствование закладки труб в условиях шахти Каулди» Cэнтрал Асиан Аcадемиc Жоурнал оф Сcиэнтифиc Ресеарч. ст. 52-59 2022/2-3

Imenitov V.R. "Processes of underground mining in the development of ore deposits" M., "Nedra", 1978 528 p.

Baranov A.O. "Calculation of parameters of technological processes of underground ore mining" – M.: "Nedra", 1985 224 p.

Toshtemirov, U. T. (2021). ANALYSIS OF LOG CABIN DESIGNS AND SELECTION OF OPTIMIZATION CRITERIA FOR THE FORMATION OF LOG CABIN CAVITIES. Scienceweb academic papers collection. https://scienceweb.uz/publication/3141

Akbarov, T. G. (2021). INDUSTRIAL TESTS OF THE CONSTRUCTION OF A PYRAMIDAL-STRAIGHT LOG CABIN WITH COMPENSATING HOLES. Scienceweb academic papers collection. https://scienceweb.uz/publication/3142