| Title | CoAuthors | Main Language | Views | Readings |
|---|---|---|---|---|
| ECONOMICS OF OPTIMUM DURATION OF CLOSURE OF A STAGE OR “WINDOW” FOR CARRYING OUT TRACK WORK TYTDMI |
Turaev B.K., Kurenkov P.V., Bondarenko T.A. |
Rus | 299 | 299 |
| CALCULATION OF THE OPTIMAL DURATION OF RAILWAY TRACK CLOSURE FOR THE ENTIRE PERIOD OF REPAIR WORKS TYTDMI |
Bondarenko T.A., Turaev B.K. |
Rus | 244 | 244 |