№ | Муаллифнинг исми | Лавозими | Ташкилот номи |
---|---|---|---|
1 | Merganov A.M. | Dotsent | Tashkent State Transport University |
2 | Kurenkov P.V. | Professor | Russian University of Transport. |
3 | Bondarenko T.A. | Deputy Director | Research and Production Center for Information and Transportation Systems |
4 | Lesov K.S. | Professor | Tashkent State Transport University |
№ | Ҳавола номи |
---|---|
1 | 1. Bykadorov S. A. A., Ivanchina O. V., Kurenkov P. V. Dependence of costs structure on the repair window duration // Railways economics. - 2007. - №. 6. - С. 60-60. |
2 | 2. Bykadorov S. A., Ivanchina O. V., Kurenkov P. V. Determination of track repair costs in a window // Economics of railroads. - 2007. - №. 9. - С. 56-56. |
3 | 3. Bykadorov S. A., Ivanchina O. V., Kurenkov P. V. Determination of expenses from train delays during repairs // Economics of railroads. - 2007. - №. 8. - С. 80-80. |
4 | 4. Odudenko TA, Agapova Yu. Influence of the method of organizing the passage of trains in the period and after the repair and track works on the number of trains missed on the section // Actual issues of modern research. - 2018. - С. 67-74. |
5 | 5. Lesov K.S., Khalfin G.R. Diagnostic tool for indirect determination of pressing force of Pandrol Fastclip bonding terminals //Universum: Technical Sciences. 2022. №5-4 (98). - С. 54-56. |
6 | 6. Technical conditions for work on reconstruction (modernization) and repair of railroad track, approved by Order of JSC "Russian Railways" of January 18, 2013 No. 75p. |
7 | 7. Concerning the Introduction of Amendments and Additions to the Technical Conditions for Work on the Reconstruction (Modernization) and Repair of Railway Track. Approved by Order No. 101r of 21 January 2015. |
8 | 8. Bykadorov SA, Kurenkov PV, Bondarenko AA, Bondarenko TA Impact of "windows" on the operational performance of railroads. Track track facilities, No.12, 2018.- p.7-10. |
9 | 9. Osminin A. T., Sotnikov E. A., Osminin M. A. Methodological basis for the organization of repair and track works during long closures of runs with their provision of technology "in the span" // Bulletin of the Research Institute of Railway Transport (VNIIZhT Bulletin). - 2017. - Т. 76. - №. 1. - С. 25-30. |
10 | 10. Kiseleva O. G., Abdrakhmanova A. N., Omarbay M. M. Technology of passing trains during interruptions in traffic on single-track railway sections // Bulletin of the Kazakh Academy of Transport and Communications named after. M. Tynyshpayev. - 2017. - №. 2. - С. 103-108. |
11 | 11. Lesov K.S., Khalfin G.R. Feasibility study of the effectiveness of diagnostic tools //ORIENSS. 2022. No. Special Issue 4-2. - С. 208-216. |
12 | 12. Altshuller B.Sh., Kurenkov P.V., Bondarenko T.A. Economic assessment of the impact on operational performance cancellation and overdue scheduled "windows". Economics of Railways, №6, 2011.- p.23-35. |
13 | 13. Bondarenko T.A. Risk-based monitoring system of track facilities management. Proceedings of the 2nd International Scientific and Practical Conference "Actual problems of railway transport development", 7-8 Dec. Samara: SamGAPS, 2006. p. 84-88. |
14 | 14. Instruction on current maintenance of railroad track. Approved by order of Russian Railways on November 14, 2016 № 2288r. |
15 | 15. GOST 9238-83 Approximation dimensions of railroad structures and rolling stock of 1520 (1524) mm gauge. |
16 | 16. Methodology for monitoring and assessing the condition of permanent track on the basis of data obtained from the results of track measuring instruments equipped with permanent track stability control subsystems. Approved by Order No. 2115r of Russian Railways of 17 October 2017. |
17 | 17. Economics of railway construction and track facilities: textbook for universities / ed. by B.A. Volkov, V.Y. Shulga. - Moscow: Route, 2003. |
18 | 18. Economics of railway transport: textbook for universities / I.V. Belov et al. ed. by N.P. Tereshina, B.D. Lapidus, M.F. Trikhunkov. - Мoscow: UMK MPS of Russia, 2001. |
19 | 19. Methodology for calculating the effectiveness of technological processes for overhaul and modernization (reconstruction) of the track in the "window" duration of 8-12 hours on closed sections. Approved by order of JSC "Russian Railways" of November 30, 2013 №2718r. |
20 | 20. Approval of the methodology for calculating the effectiveness of technological processes for overhaul and modernization (reconstruction) of track in "windows" of 8-12 hours and on closed sections. Decree of Russian Railways No. 2718r dated November 30, 2013. |