239

  • Ссылка в интернете
  • DOI
  • Дата создание в систему UzSCI 19-07-2021
  • Количество прочтений 239
  • Дата публикации 27-03-2021
  • Язык статьиIngliz
  • Страницы149-155
Ключевые слова
Ўзбек

Proper geological and economic assessment of ore dilution and loss is important both in the feasibility study of the mining design process and during mining operations. Production capacity and profitability of the mine directly depend on the indicators of loss and dilution of ore, and are one of the main factors in assessing the prospects for the development of a mining enterprise. This, in turn, increases the significance of the indicators of dilution and loss of ore, the normalization of which is an urgent matter and requires in-depth research and research. Depending on the mining method, which is used in the process of underground mining of mineral deposits, the index of ore dilution varies. Ensuring the completeness and quality of the use of mineral resources is the main factor that causes an increase in the annual productivity of the mining enterprise, an increase in industrial reserves. The complexity of the mine structure, the instability of the ore and enclosing rocks, difficult hydro-geological conditions adversely affect the productivity of mining, causes the dilution of the ore to increase to 35-40%, and the ore loss to 25%. Millions of dollars are invested each year in mining enterprises around the world to eliminate the consequences of damage of ore dilution and loss. The article discusses the types of ore dilution during underground mining of mineral deposits and the main factors leading to it, as well as the degree and consequences of the impact of ore dilution on the economy of a mining enterprise

Имя автора Должность Наименование организации
1 Mahmudov D.R. Dotsent TDTU
2 Nurboboyev Y.T. Doktarant TDTU
3 Pardayev F.S. Assistent TDTU
4 Maxmadoliyev A.K. Assistent TDTU
5 Viktor P.M. Katta o'qituvchi University of Zambia, Zambia
Название ссылки
1 1. Vokhmin S. A., Zagirov N. H., Trebush Yu. P., Kurchin G. S. Methodological bases of normalization of extraction indices from the earth during underground mining of ore and non-metallic deposits. Bulletin of the Moscow state technical university named after G. I. Nosov. No. 2 2010 p 10-15.
2 2. Abdibaitov S. A., R. N. Alymov. Dilution of ore at the mines of the Khaydarkan Deposit and the method of its determination. Modern problems of continuum mechanics. No. 15 2012 p 134-143.
3 3. Khudayberdiev F. T., Shomurodov Sh. M. Sabirov R. R., Khudoyberdiev F. T. Assessment of dilution during underground development of narrow gold deposits. Republican scientific and technical conference "Geodesic and surveying problems of conducting cadastral works on objects of the mining and metallurgical industry" Tashkent 2018 p. 102-104.
4 4. Batugina N. S., Dzhemakulova I. D., Tkach S. M. New estimates of ore dilution in the extraction of deposits. Interexpo Geo-Siberia. 2006 No. 5 p 229-233.
5 5. M. J. Scoble, A. Moss. Dilution in underground bulk mining: implications for production management Geological Society, London, Special Publications, 1994 №79, pp 95-108.
6 6. Suglo R.S. and Opoku S. (2012) ‘An assessment of dilution in sublevel caving at Kazansi Mine’,Int. J. Mining and Mineral Engineering, Vol. 4, No. 1, pp.1–16.
7 7. Khomenko O. E., Kononenko M. N. Opening and preparation of ore deposits during underground mining. NSU, Dnepropetrovsk, 2016, 101 p.
8 8. Maximov P. S. Ways to reduce dilution in vein deposits on the example of the "Juliet" mine. International scientific and practical conference of postgraduates, undergraduates and undergraduates "Socio-economic and scientific and technological development: forecast and prospects". Volgograd 2016 p. 364-368.
9 9. P. C. Stewart, R Trueman. Strategies for Minimising and Predicting Dilution in Narrow Vein Mines – The Narrow Vein Dilution Method. Narrow Vein Mining Conference Ballarat, Vic, 14 - 15 October 2008.
10 10. Majid Mohseni, Mohammad Ataei, Reza KhalooKakaie. Economic analysis of unplanned dilution in Venarch manganese underground stopes. Iranian Journal of Mining Engineering. Vol. 13, No. 41, 2019.
11 11. A. A. Smirnov, I. V. Sokolov, Yu. G. Antipin. On the issue of economic assessment of losses and dilution during underground mining of copper ores. Mining Information and analytical bulletin No. 3, 2012 p 272-275.
12 12. B. R. Raimzhanov, A. T. Mukhitdinov, B. B. Bekmurzaev, A. R. Khasanov. Justification and selection of mining methods for mining ore bodies in the lower horizons of the Zarmitan mine. Mining information and analytical Bulletin. 2018. No. 1. p 41-49.
13 13. Khudoiberdiev F. T., Israilov M. A. Selection of optimal mining options taking into account the influence of the mining pressure of the Kyzylalmasay deposit international scientific journal "Innovative science" No. 06, 2017 p 21-23.
14 14. Akbarov, T. G., Urazov Mining Kyzylalma mine through cut and fill method by horizontal layers of the developed space. Mining bulletin of Uzbekistan 2011 no. 3. p 39-42.
15 15. Lobanov V. S., Kiselenko A. S., Mukhitdinov A. T., Kaigorodov V. I., Abdurazakov A. A. Creating a matrix of possible solutions as a method for developing effective mining technology at mining enterprises. Mining bulletin of Uzbekistan 2007 no. 4. p 51-54.
В ожидании