The paper presents the working out of the main mechanism of micro hydroelectric power stationwith propeller type a view to the rational use of high-speed water flowing into smallrivers in our country. Worked out several samples of the main mechanism, which is driven by the movement of water equipment expense. As a result of study selected the most efficient and optimal model version of equipment. Currently, worked out equipment is tested in one of small rivers in Fergana region.
№ | Muallifning F.I.Sh. | Lavozimi | Tashkilot nomi |
---|---|---|---|
1 | Qodirov D.B. | т.ф.б.ф.д. (PhD) | ТИҚХММИ |
2 | Qilichov O.. | ассистент | ТИҚХММИ |
№ | Havola nomi |
---|---|
1 | 1. Саидова Г., Муқобил энергия манбаларидан Ўзбекистонда фойдаланиш имкониятлари. - Тошкент.: ЦЗИ, 2011. - б.240. |
2 | 2. Аллаев К.Р. Энергетика Узбекистана и мира. – Ташкент.: Молия, 2017. – 388 с. |
3 | 3. Д.Б.Кодиров. Ўзбекистонда микрогидроэлектрстанцияларнинг қурилиш истиқболлари // Информатика ва энергетика муаммолари, Тошкент, 2015, № 1-2, 96-99 б. |
4 | 4. Липкин В. И., Богомбаев Э. С., Микрогидроэлектростанции: Пособие по применению. – Б. 2007. – 30 с. |